Dry Hollow Road Water Line Extension

The Project consists of constructing a new 4-inch water line extension project to upgrade the distribution system along Dry Hollow Road. The project consists of approximately 15,300 linear feet of 4-inch PVC water line; installation of two pressure reducing valve vaults; air release valves; installation of new service laterals; and installation of associated appurtenances.
Date Company Contact
1730842253
11/5/24 9:30 pm
Constructconnect 30 Technology Parkway South Suite 100
Norcross, GA 30092
Jemar Sagbigsal
Tel: 3236025079
1730885508
11/6/24 9:31 am
Norris Brothers Excavating LLC 22 Northside Lane
Crossville, TN, TN 38571
Jacob Norris
Owner
Tel: 9312776556