Consolidated Baggage Modifications in Terminal A and B - Design-Build Construction

MSCAA Project Number 19-1423-27-01

Status

Bidding Closed

Prebid Date 3/16/22 2:00pm
Bid Date 4/7/22 2:00pm

Company & Contacts

MAMCA
Stephanie Alexander  

Location

Memphis International Airport

Any and/all revisions made to this bid prior to due date will be posted on https://flymemphis.com/rfps-rfqs/ and will be the responsibility of the bidder to check for any and/all revisions.

Bid Information:

Sealed, priced proposals for Consolidated Baggage Modifications in Terminal A and B – Design-Build Construction will be received by the Memphis-Shelby County Airport Authority (Authority), Procurement Department, 4150 Louis Carruthers Drive, Memphis, TN 38118, until 2:00 p.m. Local Time on 4/7/2022. Proposals will not be received at any other location.. The Proposal Documents, including a description of the scope of work, the required response format, and additional instructions may be obtained on or after 3/7/2022 online at https://flymemphis.com/rfps-rfqs/

All Proposers are responsible for checking the Authority’s website up to the submission deadline for any updates, addenda or additional information.

The Authority reserves the right to reject any or all responses to this Request for Proposals in whole or in part; to waive any informalities, technicalities, or omissions related to this Request for Proposals; and to reject responses on any other basis authorized by the Authority’s purchasing policies.

Pre-Bid Information:

A Virtual Pre-Bid/Proposal Meeting will be held Wednesday, March 16, 2022 at 2:00 p.m. local time via video conferencing link

phone: (301)715-8592
meeting ID: 850 7734 3818
passcode: 204174)

Instructions on Pre-Bid/Proposal Meeting and Site Visit request can be found at www.flymemphis.com. Attendance at the Pre-Bid/Proposal Meeting is strongly recommended.

Project Description:

A. The “Project,” of which the “Work” of this Contract is a part, is titled Consolidated Baggage Modifications in Terminal A and B – Design-Build Construction, MSCAA Project 19-1423-27-01.

B. This project includes replacement of three existing baggage carousel/conveyor systems:
  • 1) “B” East Baggage Makeup Carousel Replacement & Split
  • 2) “A” Baggage Makeup Carousel Replacement
  • 3) Inbound “5B” Flat Plate Replacement. The scope of work consists of removal and replacement of existing conveyor and carousel systems, including necessary associated control components at the Memphis International Airport. The work includes, but is not limited to, electrical modifications, control modifications, conveyor and carousel equipment installation, an other associated efforts as required. This is a design/build contract, and the contractor will be responsible for final design of the project.

C. Subcontracts: The Contractor shall insert in each of his subcontracts the provisions contained in paragraphs C. and D., of this section and also a clause requiring the subcontractors to include these provisions in any lower tier subcontracts which they may enter into, together with a clause requiring this insertion in any further subcontracts that may in turn be made.

For questions about accessing documents, please call Memphis Reprographics at 901-381-9811.