Water Treatment Plant Equipment Upgrades
Project includes the rehabilitation of one raw water well, installation of new raw water piping from the existing wells, 750 GPM induced draft aerator, clearwell, two high service pumps rated at 750 GPM, new raw water meter, new finished water meter to existing elevated storage tank, new electrical panels, starters, and wiring, and new SCADA system.
Addenda
(click to expand/collapse)
Name | Size | |||
22209.02 Stanton WTP Equip Upgrades - Addendum 1 | 2.3 MB | |||
22209.02 Stanton WTP Equip Upgrades - Addendum 2 | 109.9 KB |