63483 - Mark Anton Airport Terminal Reroof
“Work" of this Contract is defined in the Contract Documents to include the removal and replacement of approximately 2,300 square feet of standing seam metal roof. The scope of the work includes all gutters and downspouts, insulation replacement as needed, plywood sheathing replacement as needed, removal of existing metal roof and replacement, and other related work as shown on the drawings and/or in the specifications.
Bid Documents
(click to expand/collapse)
Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name | Size | ||
001 COVER | 33.9 KB | ||
002 G0.1 | 120.0 KB | ||
003 AD4.0 | 200.0 KB | ||
004 A0.1 | 131.3 KB | ||
005 A4.1 | 204.5 KB | ||
006 A4.2 | 283.0 KB | ||
007 A4.3 | 474.9 KB | ||
008 A5.1 | 166.9 KB |