166-017-03-2024 DSCC Gymnasium Roof Replacement

This project consists of the demolition and renovation of 4 existing roof areas for the Dyersburg State Community College Gymnasium, approximately 34,000 SF and their associated components. Existing roof assemebles are a mixture of concrete and tectum deck with EPDM roof membranes. Renovations consist of installing new 2-ply roof membranes, improving roof drainage, upgrading insulation values, providing new flashing and curbs as necessary at all existing penetrations and paraples.
Bid Documents (click to expand/collapse)
Hard copy and digital full sets of plans and specifications will be available for purchase at contractors expense. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
001 COVER 220.9 KB
002 G-001 382.1 KB
003 G-002 1.5 MB
004 AD-100 233.8 KB
005 AD-101 5.3 MB
006 A-101 335.7 KB
007 A-400 548.1 KB
008 A-401 805.4 KB
009 A-402 269.5 KB
010 A-403 1.0 MB
011 A-404 257.7 KB
012 S-101 222.7 KB
013 P-101 1.2 MB