TCAT Crump Plumbing and Life Safety Updates SBC No. 166/084-02-2023

The project consists of a new Low-Pressure Pipe (LPP) wastewater disposal system for the three main buildings at TCAT Crump campus. All new septic tanks, pump tanks and pressure sewer lines will be installed. The existing tankage will be crushed and filled in place. Existing sewer lines will be abandoned and left in place. The new LPP treatment field will be in six zones fed by an indexing valve.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 1 1.7 MB
Addendum 2 9.2 MB