72432 - CHA South Terminal Ramp Rehab

The project consists of the reconstruction of existing asphalt surfaced aircraft ramp and vehicle parking lot. The proposed construction includes 22,600 square yards of concrete apron and 5,700 square yards of asphalt paving. The scope encompasses all sitework, erosion control, pavement removal, drainage installation, pavement installation, edge lighting, pavement markings, turfing and other related work as shown on the drawings and/or in the specifications.
Addenda (click to expand/collapse)
No files in this section